For Victorian property buyers and developers
What could you build here?
Enter a Victorian address and we'll check its planning controls.
Free. No account needed.
Why SiteLogic exists
Most sites that hurt your margin look fine at first glance.
SiteLogic is the first check between a promising listing and serious due diligence. Enter an address. See the planning facts. Test a rough dwelling outcome. Run the early numbers before the expensive work starts.
01 · Address check
Check the planning basics
Zone, overlays, council, parcel area, frontage, depth, and schedule source in one place.
02 · Dwelling potential
Test what might fit
Indicative dwelling options and planning constraints, with clear warnings where detailed advice is needed.
03 · Early feasibility
Run the first numbers
Purchase price, sale assumptions, profit, and margin calculators for a first commercial read.
Development calculators
Then run the calculator that matches your project.
The SiteLogic Journal
Victorian development, explained.
Decision day: a checklist for developers and borrowers
A checklist to run once the RBA's 3 November decision is out: what to read, what to recalculate, and who to call, for developers and borrowers alike.
By SiteLogic Editorial
Three scenarios for 3 November: hold, rise or cut
What a hold at 4.60%, a rise to 4.85% or a cut to 4.35% would change for a development feasibility, an owner-occupier and an investor, with the arithmetic for each.
By SiteLogic Editorial
The November RBA meeting and the Statement on Monetary Policy: what comes when
The Monetary Policy Board meets on 2 and 3 November. This guide lists what the RBA publishes, when it appears, and how a developer or borrower can use each document.
By SiteLogic Editorial
Frequently asked questions
See all →What is a residential feasibility calculator?
A residential feasibility calculator gives property developers a first commercial read before serious due diligence. SiteLogic calculates return on investment (ROI), margin on cost, residual land value, and net profit based on purchase price, construction costs, stamp duty, planning costs, and expected sale price. Use it to decide whether a site deserves deeper work.
How is ROI calculated for property development?
ROI (Return on Investment) for property development is net profit divided by total costs (purchase price plus construction and on-costs), expressed as a percentage. SiteLogic does not publish a target ROI range. Read the margin from your own inputs.
What is residual land value?
Residual land value is the maximum amount a developer should pay for land to achieve the development margin they target. It is calculated as the gross realisation (total sale price) minus a development margin minus construction costs and on-costs. Use it to back into your offer price when you already know what you want to build and what it will sell for.
What is the Victorian developer bond regime?
The bond covers apartment buildings of four storeys and above. The bond applies to a building permit issued from 1 July 2027. Check the current figure for the bond rate and the hold. Source: VIC-BOND-01 (vic.gov.au). SiteLogic models the bond as an opportunity cost when the project meets that storey threshold and the permit date is in scope.
Does SiteLogic work outside Victoria?
SiteLogic is built specifically for the Victorian property market. The calculators use Victorian stamp duty rates, Victorian zoning data (from VicPlan), Victorian council schedules (from the official Planning API), and SiteLogic build rate estimates for Victoria. Addresses outside Victoria will not return a result.
Are these calculators free to use?
Yes. Calculators, Share links and XLSX export run without an account. A PDF download needs a signed-in account. Saving a feasibility needs a signed-in account. A free account can save one project. Amendment alerts need an email subscription. Logi is part of Pro. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. Pro includes unlimited saved projects.
Check the site before you commit.
Paste a Victorian address. SiteLogic checks the planning basics and early numbers so you know whether to keep investigating. Your first address check is free, no account needed.